Coal Power Plant: Difference between revisions

From Hazeron Wiki
Jump to navigation Jump to search
(Categories.)
Line 41: Line 41:


[[Category:Buildings]]
[[Category:Buildings]]
[[Category:Power_Generation_Buildings]]

Revision as of 17:11, 21 April 2019

Building
Coal Power Plant
BCoalPowerPlant.png
Placement Requirement
Maximum Levels
  • 4
Jobs
  • 1 plus 1 for each level
Construction Materials

Tools Required

Construction Speedup


Generates electricity by burning coal.

Capacitor Storage

Capacitor storage capacity of the coal power plant is second lowest, making it nothing special or useful.

Capacity per level: 400

Production

Building Produces Consumed Required Optional
Coal Power Plant 400 Electricity