Treatment Plant: Difference between revisions

From Hazeron Wiki
Jump to navigation Jump to search
m (→‎Production: Only 10 Water from Ice.)
m (→‎Production: Corrected Water process and reordered processes.)
Line 50: Line 50:
| TL = 1
| TL = 1
| Consumed =
| Consumed =
* [[Water in the Environment]]
* 10 [[Ice]]
| Required =
| Required =
| Optional =
| Optional =
Line 61: Line 61:
| TL = 1
| TL = 1
| Consumed =
| Consumed =
* 10 [[Ice]]
* 10 [[Water in the Environment]]
| Required =
| Required =
| Optional =
| Optional =

Revision as of 18:49, 31 August 2016

Building
Treatment Plant
BTreatmentPlant.png
Placement Requirement
  • Land or coast near Road or lava
Maximum Levels
  • 4
Jobs
  • 1 plus 1 for each level
Construction Materials

Construction Speedup


A treatment plant produces water, myrathane and magmex. Water can be produced from the enviroment if the treatment plant is placed in water. Alternatively ice can be gathered using a mine, and then melted at a treatment plant. Myrathane and magmex require placement in the liquid present on a Frigid or Inferno world respectively.

Production

Building Produces Consumed Required Optional
Treatment Plant 10 Magmex

Treatment Plant 10 Myrathane

Treatment Plant 10 Water

Treatment Plant 10 Water