(05-30-2020, 03:19 PM)Deantwo Wrote: Sound like a weird thing to try and do. Some manufacturing processes have a high amount of output, biggest example I can think of is Paper Mill outputting 250 ParcX Boxes per workshop per run, that would mean that ALL generic factory buildings need to have room for a lot of storage per workshop.
In this case, the building will need to hold at least 250 units (with some extra space). One output of one production line.
This will be enough to prevent situations like this one.