FTL Drive Module: Difference between revisions

From Hazeron Wiki
Jump to navigation Jump to search
(→‎Produced by: Added all the FTL Drive model variants.)
(Removed mention of TL. Added research time information.)
Line 1: Line 1:
{{Commodity
{{Commodity
| Name = Warp Drive<br> FTL Module
| Name = Warp 9<br> Drive FTL Module
| Picture = C_FTLModule.png
| Picture = C_FTLModule.png
| Cost = 464,099.84¢
| Cost = 464,099.84¢
Line 7: Line 7:
| Capacity =  
| Capacity =  
}}{{Commodity
}}{{Commodity
| Name = Wormhole Drive<br> FTL Module
| Name = Wormhole PPN<br> Drive FTL Module
| Picture = C_FTLModule.png
| Picture = C_FTLModule.png
| Cost = 53,405.77¢
| Cost = 53,405.77¢
Line 15: Line 15:
}}
}}


FTL modules are used to change a current [[FTL_Drive|FTL drive]] of a [[spacecraft]] to the upgrade module's type.
FTL modules are used to change a current [[FTL_Drive|FTL drive]] of a [[spacecraft]] to the upgrade module type.


They can also be used to upgrade the [[TL]] of a FTL drive, if the spacecraft has a high enough TL [[Command_And_Control_Module|command and control module]] installed.
They can also be used to upgrade the [[quality]] of a spacecraft's FTL drive subsystem.
 
==Patent Research Time==
The research time to complete a FTL drive [[patent]] gets progressively longer the more advanced it is.
 
* Wormhole P = 1 hour
* Wormhole PN = 1 day
* Wormhole PNN = 2 days
* Warp 1 = 1 week
* Warp 2 = 2 weeks
* Warp 3 = 3 weeks
* Warp 4 = 4 weeks
* Warp 5 = 5 weeks
* Warp 6 = 6 weeks
* Warp 7 = 7 weeks
* Warp 8 = 8 weeks
* Warp 9 = 9 weeks


==Produced by==
==Produced by==

Revision as of 19:41, 25 December 2019

Commodity
Warp 9
Drive FTL Module
C_FTLModule.png
Nominal Cost
464,099.84¢
Weight
68.04kg
Pack Size
  • 240
Commodity
Wormhole PPN
Drive FTL Module
C_FTLModule.png
Nominal Cost
53,405.77¢
Weight
68.04kg
Pack Size
  • 240


FTL modules are used to change a current FTL drive of a spacecraft to the upgrade module type.

They can also be used to upgrade the quality of a spacecraft's FTL drive subsystem.

Patent Research Time

The research time to complete a FTL drive patent gets progressively longer the more advanced it is.

  • Wormhole P = 1 hour
  • Wormhole PN = 1 day
  • Wormhole PNN = 2 days
  • Warp 1 = 1 week
  • Warp 2 = 2 weeks
  • Warp 3 = 3 weeks
  • Warp 4 = 4 weeks
  • Warp 5 = 5 weeks
  • Warp 6 = 6 weeks
  • Warp 7 = 7 weeks
  • Warp 8 = 8 weeks
  • Warp 9 = 9 weeks

Produced by

Building Produces Consumed Required Optional
Airport Repair Shop 10 Warp 1 Drive FTL Module

Airport Repair Shop 10 Warp 2 Drive FTL Module

Airport Repair Shop 10 Warp 3 Drive FTL Module

Airport Repair Shop 10 Warp 4 Drive FTL Module

Airport Repair Shop 10 Warp 5 Drive FTL Module

Airport Repair Shop 10 Warp 6 Drive FTL Module

Airport Repair Shop 10 Warp 7 Drive FTL Module

Airport Repair Shop 10 Warp 8 Drive FTL Module

Airport Repair Shop 10 Warp 9 Drive FTL Module

Airport Repair Shop 10 Wormhole P Drive FTL Module

Airport Repair Shop 10 Wormhole PN Drive FTL Module

Airport Repair Shop 10 Wormhole PNN Drive FTL Module