I built hydroelectric and coal power plants, without finalizing the designs over. The construction window said they would need lots of plastic but the construction process did not require it.
So existing designs do not have to be finalized again to benefit from the changes. It is desirable to finalize them again, so the proper quantities of plastic show up on the analysis report and on the construction window.
So existing designs do not have to be finalized again to benefit from the changes. It is desirable to finalize them again, so the proper quantities of plastic show up on the analysis report and on the construction window.