10-15-2018, 10:26 AM
(This post was last modified: 03-23-2022, 08:15 AM by Deantwo.
Edit Reason: Formatting.
)
A ship was damaged. The ship took 10 million metal to build, but at 90% hull, it required 70 million metal to repair.
What gives?
What gives?