Hydroelectric Power Plant: Difference between revisions

From Hazeron Wiki
Jump to navigation Jump to search
(Feel the waves!)
(No difference)

Revision as of 12:53, 28 May 2015

Building
Hydroelectric Power Plant
Hydroelectric_Power_Plant.png
Placement Requirement
Maximum Levels
  • 4
Jobs
  • 1 plus 1 for each level
Construction Materials

Tools Required

Construction Speedup


This type of power plant is generally seen as the best possible choice when there is a body of water available. It can not be used on lava or myrathane seas.

Production

Building Produces Consumed Required Optional
Hydroelectric Power Plant 800 Electricity