Shores of Hazeron

Underpower-Natural Gas

Underpower-Natural Gas by Heron Malkin
BUILDING
44,464m³ Batteries, 6,134 Terajoules
4,338m³ Commodity Storage, 51,065 Units
9,760m³ Generator Equipment, 4 Generators
70m³ Office Space, 2 Offices
Environments
Land and Atmosphere with Breathable Air Ok
Uses
Natural Gas Power Plant

STRUCTURE
Stone Q1 Construction
Unarmored Absorbs 18%+18hp Damage
Framework 18% of Structure
71,576m³ Volume
51m Length
44m Width
36m Height
Model Size
355 Faces
368 Triangles

DAMAGE CONTROL
22,554 Total Hit Points
15,075 Structure Hit Points
7,068 Framework
592 Commodity Storage
7,415 Hull
7,479 Equipment Hit Points
1,346 Generator
6,133 Battery

CONSTRUCTION
Estimated Build Time 1 hours, 10 minutes, 29 seconds.
2,694 Mechanical Part
13,615 Metal
595 Stone
Computer
Electricity
Hammer
SUV
Shovel
Wrench