Shores of Hazeron

HEV Arena Dome 2052

HEV Arena Dome 2052 by Henri
BUILDING
60,000m³ Arena Space, 12 Arenas
34m³ Office Space, 1 Offices
Environments
Land with Breathable Air Ok
Land with Unbreathable Air Ok
Land in Frigid Zone Ok
Land in Inferno Zone Ok
Sea Bottom Ok
Sea Bottom in Frigid Zone Ok
Gas Giant Core Ok
Intended Use Arena
Uses
Arena
Hangar
Observatory
Police Station

STRUCTURE
Metal Q1 Construction
Unarmored Absorbs 9%+9hp Damage
Framework 33% of Structure
89,348m³ Volume
208m Length
206m Width
105m Height
Model Size
22,395 Faces
24,229 Triangles

ELECTRONICS
171m³ Life Support
Life Support Module Q1

DAMAGE CONTROL
24,165 Total Hit Points
24,142 Structure Hit Points
15,920 Framework
8,222 Hull
23 Equipment Hit Points
23 Life Support

CONSTRUCTION
Estimated Build Time 8 minutes, 22 seconds.
26 Electronic Part
24 Mechanical Part
1,872 Metal
24 Plastic
24 Textiles
Computer
Electricity
Glue Gun
Hammer
SUV
Sewing Needle
Shovel
Soldering Iron
Wrench