Shores of Hazeron

Hydroelectric 16 Generators

Hydroelectric 16 Generators by Haxus
BUILDING
130,000m³ Batteries, 17,933 Terajoules
940m³ Commodity Storage, 11,065 Units
38,000m³ Generator Equipment, 16 Generators
34m³ Office Space, 1 Offices
Intended Use Hydroelectric Power Plant
Uses
Hydroelectric Power Plant

STRUCTURE
Stone Q1 Construction
Unarmored Absorbs 18% 18hp Damage
Framework 0% of Structure
Inadequate for Frigid Land
Inadequate for Frigid Sea Bottom
Inadequate for Gas Giant Sea Bottom
Inadequate for Inferno Land
Inadequate for Sea Bottom
168,974m³ Volume
38m Length
200m Width
66m Height
Model Size
184 Faces
374 Triangles

DAMAGE CONTROL
46,251 Total Hit Points
23,076 Structure Hit Points
128 Commodity Storage
22,948 Hull
23,175 Equipment Hit Points
5,242 Generator
17,933 Battery

CONSTRUCTION
Estimated Build Time 3 hours, 41 minutes, 7 seconds.
10,486 Mechanical Part
41,111 Metal
1,458 Stone
Hammer
Wrench